Southeast Brook Bridge

Replacement of The Southeast Brook Bridge in Gros Mourne National Park involved a paved temporary bypass consisting of a 140' clear span panel bridge. The filly-integral designed replacement structure includes piled foundations for a 39m clear span New England Bulb Tee (NEBT 1800) concrete girder superstructure with concrete abutments and deck.

Project Details | Visit Website

Sir Robert Bond Bridge

Replacement of The Sir Robert Bond Bridge is a vital part of Newfoundland and Labrador’s transportation network as it is the only east-west highway link that crosses the Exploits River.

Project Details | Visit Website

Sandy Lake Narrows Bridge

Replacement of the Sandy Lake narrows bridge on route 401 near Howley This project involved the complete replacement of a three-span concrete girder bridge over Sandy Lake Narrows near Howley, NL. The new structure consisted of two single 75m span, trapezoidal steel box girders that were launched into place on concrete abutments.

Project Details | Visit Website

E.S. Spencer Bridge

This project involved the complete replacement of a three-span concrete girder bridge over a federally scheduled salmon river (Terra Nova River). The new structure consisted of two single 75 m span trapezoidal steel box girders that were launched into place on concrete abutments.

Project Details | Visit Website

Robinsons River Bridge

Construction of a two lane, two span, 76 meter prestressed concrete girder bridge and approaches at Robinsons River, Route 1, km 800.

Project Details | Visit Website

Kenamu Bridge

Supply and installation of an 81meter single span two lane galvanized steel truss-type bridge structure across the Kenamu River on RT500 (Trans Labrador Highway) KM 62.75. Job entailed jobsite concrete batch to produce the 1500cu m of concrete for abutments and launch of the 81m span bridge assembled on shore.

Project Details | Visit Website

North Branch Trailway Bridge

Removal of Superstructure of the North Branch T'railway Bridge and installation of 180ft steel panel bridge on the North Branch River.

Project Details | Visit Website

Flat Bay Bridge

Construction of two lane, single span, 46 meter prestressed concrete girder bridge and approaches at Flat Bay TCH Km 772.6. Involved driving H piles for foundations and building 46m concrete girders on site and removal of existing bridge.

Project Details | Visit Website

Searston Gut Bridge

Removal and Salvage of a 152.2 meter, single lane, panel bridge over the Codroy River at Searston Gut, Route 407, km 10.48.